Putin plays on the nerves of Europe. Gazprom will completely stop the north stream at the end of August
The only operating gas pumping unit of the starting compressor station of the North Stream-KS Portoto Trent 60-will be stopped from August 31 to September 2 for maintenance and planning work. According to Interfax with reference to Gazprom's statement, after the completion of the work and the absence of technical faults of the gas transportation unit, it will most likely be restored to 33 million cubic meters per day.
Video of the Day "Complex of Regulatory Works in accordance with the current maintenance contract will be done in conjunction with Siemens specialists", - said the Russian monopolist.
“According to the technical documentation of Siemens every 1000 hours it is necessary to carry out maintenance of the unit, which includes: inspection of the case for cracks, potholes, deformations, stains of adhesive, cleaning of the body; inspection of oil supply systems, air, removal of gas combustion products for the presence of leakage, stretching of joints and elimination of causes of leaks; Checking the performance of safety valves and adjusting the air flow control system, ”the message said.