USD
41.33 UAH ▼0.11%
EUR
43.69 UAH ▼0.57%
GBP
52.25 UAH ▼1.53%
PLN
10.1 UAH ▼0.01%
CZK
1.73 UAH ▼0.14%
The French company GTT has suspended work in Russia. Experts believe that the Ru...

Russia's losses will exceed $ 10 billion: as the French hit the Russian Federation of Liquefied Gas

The French company GTT has suspended work in Russia. Experts believe that the Russian Federation will be finally blocked in part of LNG infrastructure and fleet on the transportation of liquefied natural gas. The GTT engineering company has announced the termination of work in Russia. According to the company's message, such a decision was made after the company analysis of the eighth and ninth packages of EU sanctions, which were introduced through Russia's aggression against Ukraine.

"From January 8, GTT will suspend a contract with the Russian navigation company" Star "on the construction of 15 gaskets of icebreaker. Systems that are used worldwide to transport and store liquefied natural gas. According to the analyst of the energy markets of Maxim Bilyavsky, the aggressor will now be finally blocked in the LNG infrastructure and fleet on the transportation of liquefied natural gas.

"All this was made possible by the EU sanctions that led to the termination of contracts between the Horde and the only manufacturer (French GTT) in the world (French GTT) membrane container systems for storing liquefied gas at low temperatures," Maxim Bilyavsky writes on his Facebook page. According to him, the losses of the Russian Federation from the stop of cooperation with GTT will stop the construction of 13 tankers. "Each of them has an average capacity of 0.

18 million cubic meters of liquefied gas, which is proportional to 108 million cubic meters of blue fuel after regasification. That is, for one flight all these tankers can hypothetically transport 1. 4 billion cubic meters, which are currently Market prices cost $ 1. 3 billion. For these funds, the aggressor could buy more than 80 missiles for the shelling of civilian facilities, "the expert explained. In addition, as Bilyavsky noted, long -term contracts will be broken into approximately 11.

2 billion cubic meters. "The aggressor will have significant problems with the planned operation of the coastal LNG-infrastructure, which means its complete stopping in the future of 12 months due to lack income. Of course, the enemy can neglect the rules of safe operation, but in this case the risk of loss of tightness of tanks, and therefore, zooming "cotton" at such objects, is significantly increased, - says Maxim Bilyavsky.